Class Overview:
Day 5- Building Envelope
CLASSROOM: Discuss ‘Thermal Bypass and Quality Insulation Installation’, ‘Thermal Imaging’.
HANDS ON: Inspect a wall section, working some of the areas discussed, Use an IR camera and review the results, using a hot wall for the training.
Wollin Group, Inc we strive to provide with the MI-BEST Training the building and HVAC industry with assistance in energy efficient design and installation, sustainable construction options, and building procedures that promote durability and occupant comfort. As buildings continue to become more performance oriented, the details and materials used in the construction process become increasingly important both in choice and integration.